Welcome to HAQ Construction & Renovations

Apartment & Condo Remodeling Contractors in New York

Licensed and insured apartment and condo remodeling across New York City and Westchester — renovations run through your building’s board, its alteration agreement and the city’s filings, under one contract: (917) 945-8965.

Apartment & Condo Remodeling Solutions

An apartment remodel in New York answers to three parties, not one. There is you, the owner, with a home to improve. There is your building — its board, its managing agent, its alteration agreement — which decides whether the work may happen at all, and on what terms. And there is the city, whose filing desk decides what may be built. HAQ Construction runs whole-unit renovations in co-ops and condos across Manhattan, Brooklyn, Queens, the Bronx and Westchester County, from our base at 750 Kimball Ave in Yonkers.

The building’s half of the job is where apartment projects are won or lost. Work hours, elevator reservations, insurance certificates naming the building, protection for hallways and neighbouring doors, a board architect reading your drawings — handled late, each one stops a project cold. Handled first, the renovation runs on rails: an approved scope and a calendar the building has accepted.

So HAQ starts where the building starts. We read your alteration agreement before design begins, assemble the board package with you, confirm which parts of the scope need city filings, and only then price the work in writing. One contract covers the package, the filings and the build. For scope beyond one unit, our interior renovation team carries the larger programme under the same standard.

What Is Apartment & Condo Remodeling?

Apartment and condo remodeling is the renewal of a whole home inside a building other people also live in. Layout, kitchen, bathrooms, flooring, systems and finishes are rebuilt as one project — but unlike a house, the unit shares its walls, floors, plumbing risers and electrical service with neighbours above, below and beside it. Almost everything about the work is shaped by that shared structure.

Ownership shapes it too. In a co-op you hold shares in the corporation that owns the building, and a proprietary lease — which is why the board’s authority over your renovation is broad, and its approval the strictest gate the project passes. In a condo you hold a deed to the unit itself; the board’s reach is narrower, but its rules still bind every day of the job. Either way, the document that governs your renovation is the building’s alteration agreement.

The city adds its own line. Painting, plastering, installing cabinets, replacing fixtures and resurfacing floors generally need no work permit. Moving plumbing, gas or electrical work, or changing the layout, generally does — typically filed as an Alteration Type 2, and an Alteration Type 1 where units are combined or use and egress change. And a layout cannot go just anywhere: a kitchen or bathroom must stay over another wet space, never above a neighbour’s living room or bedroom.

Apartment & Condo Remodeling Services in New York

Six kinds of work cover every unit renovation we are called to — each scoped against your building’s rules, not just your rooms.

Complete Apartment & Condo Remodeling

The whole unit as one project: layout, kitchen, bathrooms, systems and finishes rebuilt in sequence, from the board package to the final walk-through. One contract, one schedule, one contractor answerable to you and to your building.

Space & Layout Reconfiguration

Walls moved, rooms combined, a galley kitchen opened to the living space — drawn inside the limits a building sets. Wet rooms stay over wet rooms, structural walls stay where the frame needs them, and any plan the board cannot approve is redesigned on paper first.

Kitchen & Bathroom Upgrades

The two rooms buildings scrutinise hardest, because they carry the plumbing. Inside a whole-unit scope they are designed with the layout and filed with it — our kitchen remodeling page and bathroom renovation page detail each room's work. Sequenced with the rest of the unit, neither room is rebuilt twice.

Electrical, Plumbing & System Upgrades

A unit's systems are the building's systems in miniature: risers, stacks and service shared with every neighbour. We renew what the unit controls — circuits, fixtures, valves, branches — in coordination with building staff, filed where the city requires filing.

Interior Finishes & Flooring Installation

The surfaces that make a unit feel finished: flooring laid to your building's sound requirements, walls and ceilings levelled and painted, trim, doors and hardware carried through the home in one palette — installed inside the building's hours and protection rules.

End-to-End Project Coordination

The invisible half of every apartment renovation, run as a service in its own right: the alteration package assembled and submitted, the managing agent answered, elevator time booked, deliveries and debris routed as the building directs. One schedule, one person answerable for all of it.

Renovating a house rather than a unit? Our full home renovation page covers whole-property projects — or call (917) 945-8965.

Looking for TrustedApartment & Condo Remodeling Contractors Near You ?

Most units we are called to are not failing — they are frozen. A layout from another era, a kitchen and bath a generation old, finishes worn thin, and an owner putting the project off because the building’s approval process sounds like a second job. It is a process, not a mystery — and running it is the contractor’s job, not yours.

HAQ Construction remodels apartments and condos across Manhattan, Brooklyn, Queens, the Bronx, Yonkers and Westchester County — pre-war co-ops, post-war condos, and everything between. The first step is a free estimate: we visit the unit, read the alteration agreement, and put the scope in writing. Call (917) 945-8965 to book a visit.

Benefits of Apartment & Condo Remodeling
Improved Living Comfort & Functionality

A whole-unit plan fixes what room-by-room patching never reaches: the layout that wastes the entry, the kitchen that seats nobody, storage that exists nowhere. Comfort in a New York apartment is designed, not accumulated.

Increased Property Value

In a co-op or condo, buyers read the renovation and its paperwork together. A unit renovated with board approval and city filings where required — documented, inspected, finished throughout — supports its value in a way an unapproved refresh undermines at resale.

Optimized Use of Limited Space

Apartments rarely gain square feet; they gain use. A wall moved honestly, storage built into dead corners, a second bath where plumbing allows — a planned unit lives larger than its floor plan.

Upgraded Systems & Interior Performance

Behind the finishes, a renovation renews the unit's share of the building: modern circuits for modern loads, sound valves and waste lines, ventilation that actually clears a bath.

Better Durability & Building Compliance

Work done to the building's rules and the city's code — permitted where required, inspected where filed — never has to be explained, undone or redone for the next owner, the next board, or a buyer's engineer.

Long-Term Quality & Peace of Mind

A unit renovated in the right order — approvals first, systems before finishes — should need care, not rescue, for years. HAQ guarantees the quality of its workmanship, and the written scope you sign is the scope we build.

How We Work — From Building Review to Final Walk-Through

01

Consultation & Building Review

We visit the unit, measure it, and check what the finishes hide — then we read your building’s alteration agreement and house rules. The approval path is set at this first stage: what the board will require, what the city will require, and what your scope involves.

02

Board Package, Design & Filings

Layout, finishes and systems are fixed on paper. The board package — drawings, scope, schedule, our license and an insurance certificate naming your building — is submitted, and city filings go in where the scope needs them. The written estimate prices the approved plan.

03

The Build, Inside Building Rules

Demolition and construction run inside the terms your building set: permitted work hours, booked elevator time, protected hallways, debris out by the route the building directs. Rough work is inspected where filed; finishes follow in sequence.

04

Final Walk-Through & Building Sign-Off

We walk the finished unit with you against the written scope — every room, every finish, every system running. Anything short is listed and closed out, the building’s completion requirements are satisfied, and you hold the paperwork.

Reliable Project Maintenance

After the walk-through we stay reachable — a valve that drips, a door that drifts, the small settling repairs a renovated unit asks for. One call covers the unit; the same team answers.

Design & Structural Planning

A unit plan has to satisfy three judges at once: the household that lives in it, the building that approves it, and the structure that carries it. Layouts are drawn inside wet-over-dry limits from the first sketch — a plan the board can approve is the only plan worth pricing.

Electrical & Safety Solutions

Apartments concentrate a home’s risks along shared walls and risers: water beside electricity, gas beside open flame, work above a neighbour’s ceiling. Circuits, outlet protection, shut-offs and ventilation are treated as the safety systems they are, installed to code.

We keep the promises simple: the building’s approval earned before demolition, filings settled in the open, workmanship whose quality is guaranteed. HAQ Construction is licensed and insured, rated 4.8 stars from 59 Google reviews, with free estimates across New York City and Westchester. Call (917) 945-8965.

Posted on Google Google
Samia Sohail profile picture
Samia Sohail
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Very Good work
Posted on Google Google
Hassham Rajan profile picture
Hassham Rajan
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
HAQ Constructions has remodeled our client's premises in ArdsleyPark. Very satisfied and highly recommended
Posted on Google Google
Samia Afzal profile picture
Samia Afzal
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Excellent and professional work done by this group, would highly recommend to others !!
Posted on Google Google
Ashmit Sharma profile picture
Ashmit Sharma
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great service experience. 💯💯
Posted on Google Google
Luqman Warriach profile picture
Luqman Warriach
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Had plumbing issue, they quickly came and fixed... highly recommend they know exactly what they are doing..
Posted on Google Google
Aisha Khalid profile picture
Aisha Khalid
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
HAQ Construction remodeled my bathroom. They did an amazing job while being extremely reasonable compared to my other quotes. The owner was very responsive to any questions I had and commented well throughout the entire process.

Transform Ideas Into Strong Foundations

We are committed to providing responsive communication, clear project guidance, and dependable construction support. Whether you need a detailed estimate, technical consultation, or service inquiry, our team is ready to assist you with professional solutions.

Send Us Message

Apartment & Condo Remodeling in New York: Two Rulebooks Run Every Job

Your Building's Rulebook: The Alteration Agreement

Before the city’s rules come your building’s. Nearly every co-op, and most condos, require an alteration agreement signed before work starts: the scope described, drawings attached, your contractor’s insurance certificate naming the building, the hours work may happen, the elevator reserved, hallways and neighbouring doors protected. Many buildings send the package to their own architect or engineer for review, and charge a review fee — the amount is the building’s, and it varies. In a co-op, where you hold shares and a proprietary lease rather than a deed, expect the stricter review. HAQ assembles this package as part of the job.

The City's Rulebook: Filings, Wet-Over-Dry & Older Buildings

The Department of Buildings draws its own line through your scope. Cosmetic work — paint, plaster, cabinets, fixtures replaced in place, floors resurfaced — generally needs no permit. Work that moves plumbing, gas or wiring, or changes the layout, is filed work: typically an Alteration Type 2 in an apartment, an Alteration Type 1 where units combine or use changes. Two limits shape every plan: a wet room must stay over a wet room; and in homes built before 1978, disturbed paint falls under the EPA’s lead-safe work rules, with the city’s own lead requirements added where young children live.

Not sure which rulebook decides your project — or whether your building will allow the layout you want? Call (917) 945-8965: the free estimate starts with your alteration agreement. For work beyond a single unit, see our general contractor page.

Frequently Asked Questions — Apartment & Condo Remodeling in New York

Find clear answers to common questions about our construction, renovation, masonry, roofing, and remodeling services.

What is included in apartment and condo remodeling services?

As much of the unit as your scope covers: layout changes, kitchen and bathrooms, flooring, systems work and finishes throughout — plus the part house renovations never need: the board package, the building’s insurance and protection requirements, and city filings where required. Your written estimate lists every included item before work begins.

In nearly every co-op and most condos, yes — the approver is your building’s board and managing agent rather than an HOA, and approval comes before work, under an alteration agreement. The package typically covers drawings, the scope, a schedule, and your contractor’s license and insurance certificate naming the building. Starting without it can stop a project mid-demolition.

The build itself runs in weeks for a cosmetic scope and longer for a full unit with layout and systems work. The calendar owners forget is the one before demolition: board review, any architect review the building requires, and city filings set the real start date, and buildings limit work to set hours each day. Your written scope separates approval time from build time.

It is usually the point. Apartments gain use rather than area: a wall moved where the building allows, storage built into space that was doing nothing, a kitchen planned around how the household cooks. Inside wet-over-dry and structural limits, a planned small unit routinely lives like a larger one.

A documented one is. Buyers, boards and lenders all read the paperwork as well as the finishes: approval granted, filings closed, systems renewed behind new surfaces. That record protects the value the renovation creates — where an unapproved job can cost value at resale, when a buyer’s engineer asks how the work was done.

It is the contract between you and your building that governs the renovation: what may be done, when, by whom, with what insurance, and how the building and your neighbours are protected. The package that earns its signature — drawings, scope, schedule, contractor credentials and insurance naming the building — is assembled by your contractor with you; HAQ prepares it as part of the job.

Often, yes — it is one of the most requested unit changes in New York. It is also among the most governed: combining units changes the home’s use and egress, so in the city it is generally filed as an Alteration Type 1, and the board’s approval is at its most searching. Wet rooms still have to stack over wet rooms. We assess the pair of units before any design is drawn.

It depends on four things no website can see: the size of the unit, how much layout and systems work it hides, what your building’s approval requires, and the finish level you choose. Anyone who prices a New York apartment without visiting it — and reading its alteration agreement — is guessing with your money. Our estimates are free, on site and written: call (917) 945-8965.